The Mil-PRF-38535 Standard
The
Mil-PRF-38535
U
A non-QML-certified
manufacturer must adhere to the stringent and non-flexible requirements
of the military for the manufacture and repetitive testing of its
military products. Once a manufacturer is granted QML status,
however, it is allowed to use best-known commercial practices to
manufacture its products using its own process flows, as long as these
are shown by
data
to produce products that meet military standards. Thus, a QML-certified
manufacturer is free to pursue continuous improvements on its own,
usually in the form of
elimination
of
non-value-added
process steps.
The first
requirement of Mil-PRF-38535 is for the manufacturer to have a
quality management (QM)
program that is documented in its QM plan. The manufacturer must
subject its QM program to self-assessments, results of which shall be
made available for review.
The manufacturer must also
form a
Technical
Review Board (TRB),
which shall be responsible for the following: 1) development of the QM
plan; 2) control of process changes, which includes qualification and
certification of all processes; 3) analysis of reliability data; 4)
failure analysis functions; 5) implementation of corrective action and
recall procedures; etc.
The TRB shall maintain
records of all its deliberations and decisions, which shall be made
available for review. The TRB shall ensure that the
QM plan
includes the following: 1) quality improvement plan; 2) failure analysis
program; 3) statistical process control (SPC) plan; 4) corrective action
plan; 5) change control program; 6) standard evaluation circuit (SEC)
and technology characterization vehicle (TCV) program; and 7)
certification and qualification plan.
The Mil-PRF-38535 also defines
requirements for
change control
procedures. All changes to any part of a QML manufacturer's line
are to be governed by the manufacturer's TRB. Any change shall be
documented as to the reason for the change with relevant data taken to
support the change, including reliability data as appropriate. The
criticality of the change shall be based on the
effects
of the change on quality, reliability, performance, and
interchangeability of the resulting microcircuits. The next page shows
examples of manufacturing process changes that require TRB evaluation
and approval per Mil-PRF-38535.
<Page 2 - Changes Requiring TRB Approval>
<Page 3 - QML Certification>
|