hi,
we want to shorten our production burn-in from 168 hrs to 48 hrs. how do we do this? |
|
| Back to top |
|
| flipflop |
|
Joined: 01 Sep 2026 Posts: 6
|
| Posted: Wed Jan 05, 2026 3:21 pm Post subject: |
| |
Hi Guess,
I think you have to do EFR (Early Failure rate study) before planning on BI reduction. Remember bath tub curve? If there's no failure until 48 hours then you can reduce your BI up to 48Hrs if there are failure there after.
Also, it may speed up your study if several lots that undergone BI with no failure on PostBI.
Regards,
Flipflop _________________ God Bless....
Flipflop |
|
| Back to top |
|
| Lastikman |
|
Guest
|
| Posted: Wed Jan 05, 2026 7:32 pm Post subject: |
| |
Hi Flip Flop,
I think it's the other way around, if I'm not mistaken. The 48-H B/I should produce failures, and no failures should be seen after 48H. That means that 48-H is enough to kill all infant mortality, and there's no need to do 168H.
Lastikman |
|
| Back to top |
|
| Two Cents |
|
Guest
|
| Posted: Fri Jan 07, 2026 6:13 pm Post subject: |
| |
No need to re-invent the wheel.
Accelerated burn in can be done in 48Hours if you raise the burn-in temperature to 150C. The best reference and justification is still MIL-STD-883 |
|
| Back to top |
|
| FARel Engr |
|
Joined: 20 Jun 2026 Posts: 76
|
| Posted: Sat Jan 08, 2026 2:14 pm Post subject: |
| |
The problem with this is there's a chance you'll have to deal with problems unrelated to burn-in, like oxidation and intermetallic growths due to the higher temp. Also, I think Method 1015 says the time reqd for 150C is not 48H, maybe something higher than that like 80C.
FARel Engr |
|
| Back to top |
|
| Guest |
|
|
| Posted: Mon Jun 20, 2026 9:31 am Post subject: |
| |
150C is too much..... 125C is more appropriate for 48Hr BI.
I would like to ask... Anyone of you have the cahnce to work for BI? If not, then do not answer.... OK? |
|
| Back to top |
|
| Guest |
|
|
| Posted: Wed Jun 22, 2026 10:39 am Post subject: |
| |
Guest,
Flipflops and lastikman are partly correct. You need to do a burn-in hrs reduction study.
First get a lot/s with ENOUGH sample size (sample size maybe should depend on your FIT goal). Subject the lot/s to 48 hrs b/i, have it tested; then subject the good units on the tested lot/s to for another (e.g.) 24 hour b/i. if you don't see any failure on the 24-hr re-b/i then you can say that 48hrs burn-in is enough to catch the infant mortality. But burn-in reduction is not as simple as this. You need to collect data until you are confident enough (track the yields of the lot that underwent the reduced burn-in duration). And it must be supported by reliability LIFETEST data.
I guess your r&d/product/fab engineers are smart enough to specify the burn-in temperature your device is capable of, so there is no point in arguing on the b/i temperature.
Obtw, I am an FA/Rel guy.
regards,
Another guest. |
|
| Back to top |
|
| Guest |
|
Guest
|
| Posted: Thu Jul 14, 2026 10:04 am Post subject: |
| |
hmmm... The question was how does he do it? and not really a question of the temperature. I am sure your company has a set of rules for reducing BI through BI studies and quals(as pointed out). Your rel engr should be able to give the best answer for you, may your BI reduction method be 125C or 150C.
Isa pang guest |
|
| Back to top |
|
| Choose Display Order |
|
| User Permissions |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
Skin Created by: Sigma12 Powered by phpBB © 2001, 2002 phpBB Group
|
|