Is delam a failure?

 
       SemiconFarEast.com Forum Index -> QA/FA/Rel Forum
View previous topic :: View next topic  
Author Message
enimen
Guest





PostPosted: Fri Jul 11, 2026 9:32 pm    Post subject: Is delam a failure? Reply with quote

Is delam in a package a failure? What if the delam is not so large? If the unit is still good after rel but there is a delam, is that a rel failure? I can't believe a qual can fail because of just a delam.

enimen


Back to top
EE



Joined: 16 Jun 2026
Posts: 109
Location: Paranaque City, Phils.

PostPosted: Thu Jul 24, 2026 11:21 pm    Post subject: Reply with quote

Hello enimen,

Package delam per se is not necessarily a failure, but it is a failure attribute, i.e., it is something you observe when a 'real' failure such as package cracking occurs. Nonetheless, it does qualify as a failure under certain circumstances, e.g., if it slices across the die surface thereby endangering the bondwires or if it is accompanied by an internal crack.

Even if significant delam is observed, a qual sample may not be considered as a valid qual failure as long as it passes electrical test after the prescribed reliability test. On the other hand, a small delam can rain on your qual's parade if it occurs where it could make a unit fail e-test. Example: a heel break in the second bond on a bonding finger that has exhibited delam with respect to the mold compound.

Pls refer to JEDEC J-STD-0020 for more details on when a delam should be considered a failure.

Thanks and keep on posting!!!

EE


Back to top
View user's profile Send private message
enimen
Guest





PostPosted: Mon Jul 28, 2026 10:24 pm    Post subject: Reply with quote

Sorry I have no copy of J-STD-20. Can you give me more info on when a delam is a failure based on this spec. Thanks to you.

enimen


Back to top
girlash



Joined: 28 Jul 2026
Posts: 7

PostPosted: Tue Jul 29, 2026 9:20 am    Post subject: Reply with quote

Hi eminem,

I was just browsing through this JEDEC specs yesterday.
You could visit this link:
http://www.jedec.org/download/search/jstd020b.pdf

Hope this helps.


:D
girlash


Back to top
View user's profile Send private message
qtp girl
Guest





PostPosted: Wed Jun 02, 2026 10:48 am    Post subject: Reply with quote

Can bottom and die paddle delam contribute to package bulging?
if this so, how many percent will this delam event can cause package bulging...


QTP girl


Back to top
benny
Guest





PostPosted: Wed Jun 02, 2026 5:11 pm    Post subject: Reply with quote

if there's no delam at the start, then the package actually deforms or bulges first from high temp before the delam occurs. Once the delam occurred, the package can now have a bigger bulge bcos there's no plastic-leadframe adhesion to constrain it. so, yes, delam contributes to bigger package bulging. quantify the % contribution? uh-oh...that's a tough question...lemme knowthe answer if you find it!

benny


Back to top
halinawati
Guest





PostPosted: Tue Jul 06, 2026 2:45 am    Post subject: Reply with quote

Anyone of you knows how to calculate pecentage of delam accurately?
Quote:


Back to top
Guest






PostPosted: Fri Jul 09, 2026 1:24 pm    Post subject: Reply with quote

To calculate % of delam accurately, visual judging is not possible. It depend on photo softcopy, therefore u need a software to support. If talking about pass or fail criteria base on % of delam then it would be answer we looking for. Twisted Evil


Back to top
lh
Guest





PostPosted: Wed Jul 21, 2026 9:04 pm    Post subject: Reply with quote

Wink CSAM equipment today is equipped with % area delam computation......


Back to top
guest
Guest





PostPosted: Thu Sep 16, 2026 11:18 am    Post subject: Reply with quote

fyi... acceptable package delam is only 15%; more than that your package fails qual. even a 5% delam on the corners of the mold-die interface could escalate to a full delam during stress testing of the units.


Back to top
guest
Guest





PostPosted: Thu Sep 16, 2026 11:19 am    Post subject: Reply with quote

fyi... acceptable package delam is only 15%; more than that your package fails qual. even a 5% delam on the corners of the mold-die interface could escalate to a full delam during stress testing of the units.


Back to top
Display posts from previous:   
       SemiconFarEast.com Forum Index -> QA/FA/Rel Forum All times are GMT + 8 Hours
Page 1 of 1

 
Jump to:  
You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB 2.0.4 © 2001, 2002 phpBB Group
Theme created by Vjacheslav Trushkin