Curious Guest
|
Posted: Mon Jan 26, 2026 9:53 am Post subject: Question on LTPD |
|
|
For a LTPD of 5%, does it make an difference whether we choose the sample size to be 45 (0,1) or sample size to be 77 (1,2). And if there is any difference, what is the difference?
Would appreciate your input.
Thank you and regards.
|
|
| Back to top |
|
EE
Joined: 16 Jun 2026 Posts: 108 Location: Paranaque City, Phils.
|
Posted: Tue Jan 27, 2026 10:13 am Post subject: |
|
|
Hi Curious
In theory they are equivalent - they will both make you reject 90% of the time lots with a defective rate of 95%. The advantages of the 45 (0,1) sampling scheme is that it consumes less resources (since the sample size is smaller), and it gives the operator the impression that defects are not allowed (since no rejects are tolerated).
Anyway, some use 77 (0,1) just to allow for the possibility of getting a reject. Just the same, it's probably better to stick with SS=45 and to just do re-inspection at a higher sampling rate if you see a reject in a lot that you can not afford to throw away outright.
Thanks and regards,
EE
|
|
| Back to top |
|
Curious Guest
|
Posted: Tue Jan 27, 2026 6:33 pm Post subject: Question on LTPD |
|
|
Hello EE,
Thank you for your reply. My thinking is if the incoming lots defective level is around 5%, perhaps they are the same. Bu t what if the incoming lots defective level is higher, say 10%? Isn't it true that the discrimating power of the 2 sample sizes will then be different in this case? I am guessing that the operating curve for sample size of 77 will be steeper for defective level of more than 5%. Is this correct? Do you see where I am coming from?
Rgds.
|
|
| Back to top |
|
EE
Joined: 16 Jun 2026 Posts: 108 Location: Paranaque City, Phils.
|
Posted: Wed Jan 28, 2026 11:15 pm Post subject: |
|
|
Hi Curious,
You are correct! I looked at the OC curves of 2 sampling schemes for LTPD=5, and confirmed that the one with a higher sample size (and higher c) has a better chance of rejecting a lot with dpm >5%.
EE
|
|
| Back to top |
|
Curious Guest
|
Posted: Thu Jan 29, 2026 10:52 am Post subject: Question on LTPD |
|
|
Hello EE,
Thank you for checking this information out for me. On the other hand, would it be true to say that if the defective level of the incoming lots is less than 5% (say 3%, for example), the discriminating power for SS = 45 is going to better than SS=77. Again, I am guessing that the OC curve for SS=77 will be higher than SS=45 at 3%. Is this correct? If so, can we say in general that if the defective level is below 5%, smaller sample size is more discriminating but if defective level of incoming lots is above 5%, the higher sample size is better.
Would appreciate your input on this.
Thanks and regards.
|
|
| Back to top |
|
EE
Joined: 16 Jun 2026 Posts: 108 Location: Paranaque City, Phils.
|
Posted: Thu Jan 29, 2026 4:35 pm Post subject: |
|
|
Hi Curious,
You really know your OC curves very well! These are all very good info - thanks! So good in fact that I think I should add them to the article on LTPD/AQL. These forums are really useful not only for the readers, but for the website itself as well.
Thanks again and keep on contributing!
Best regards,
EE
|
|